Compliance with the most recent edition of NFPA is essential for ensuring safety at airports.
It is crucial to safeguard individuals and property from the distinct fire risks associated with airport terminal complexes. NFPA 415, which addresses Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways, serves as a reliable reference for engineers, designers, installers, contractors, and airport safety managers, providing comprehensive access to the necessary requirements for:
– Fire protection measures for airport terminal buildings.
– Fire testing and design standards for aircraft loading walkways.
Benefits of NFPA 415
For designers, engineers, contractors, installers, airport safety managers, and other terminal safety stakeholders, NFPA 415 is an essential resource. It offers the most reliable and current information on escape routes, fire safety measures, and ways to reduce the dangers of fuel spill disasters.
It is advisable to update your practices to align with the latest fire protection standards, particularly in light of the unique hazards present in airport terminal buildings, such as the risk of fuel spills.
Details of the Book
- Book Title: Standard on Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways
- Publisher: National Fire Protection Association
- Revised Edition: 2022
- Language: English
- SKU: 41522
- ISBN- 10 : 1445928550
- ISBN- 13 : 1455929552
FAQs
Q1. What is fueling?
A1. Fire extinguishers must be readily accessible on aircraft servicing ramps or aprons during fueling operations.
Q2. What is an Airport Ramp?
A2. An outdoor space, encompassing aprons and hardstands, is designated for the positioning, storage, servicing, or maintenance of aircraft, regardless of the surface type of the area.
Q3. What is Ramp or Apron drainage?
A3. The ramp or apron must be designed to incline away from the perimeter of fueling hydrants or fueling pits in order to avert flooding.
Q4. What is a Storm Drainage system?
A4. Federal, state, and local regulations, including regional or site-specific stormwater management agreements, must be complied with by the storm drainage system and stormwater management plan.
Q5. What is Aircraft Radar Equipment?
A5. Surveillance radar systems installed in aircraft must not be utilized within a distance of 90 meters (300 feet) from any fueling, servicing, or other activities where flammable liquids, vapors, or mists may be present.
Reviews
There are no reviews yet.